Service consulting hotline: +84.938.247.666
T2 - T7 8h00 - 17h30
OVERHAUL GOVERNOR YT111G FOR NABIBI
30/06/2024 Governor
OVERHAUL GOVERNOR YT111G FOR NABIBI

Governors are an essential device to maintain the desired RPM of engine/steam turbine under different working conditions.  Troubles of governors can cause major performance or safety...

View more
DYNAMIC IMBALANCE
24/06/2024 Workshop
DYNAMIC IMBALANCE

Dynamic imbalance is one of the main causes of vibration in rotating parts. This phenomenon occurs because the gravity center of the rotating part does not coincide with the rotation...

View more
OVERHAUL BEVEL GEAR OF 50 TONS CRANE OF VAT CACH PORT
23/05/2024 Hydraulic system
OVERHAUL BEVEL GEAR OF 50 TONS CRANE OF VAT CACH PORT

- Removed and transferred completed bevel gear for luffing winch from Vat Cach port to MTB workshop - Fully overhaul gear system, renewed bearings and ect - Fully overhaul hydraulic...

View more
RENEW RUDDER BEARING CARRIER
22/05/2024 Diesel Engine
RENEW RUDDER BEARING CARRIER

Date: from 17th to 20th May 2024 Position: Singapore EPL Vessel: PVT SYNERGY

View more
Overhauling AE Air Starter of MV Basel Athena
19/03/2024 Governor
Overhauling AE Air Starter of MV Basel Athena

Project: Overhauling AE Air Starter Vessel: MV Basel Athena Working place: Nosco Shipyard, Vietnam Service type: Normal Done by:  MTB engineer Team

View more
wiget Chat Zalo Messenger Chat Whatsapp Chat