OVERHAUL BEVEL GEAR OF 50 TONS CRANE OF VAT CACH PORT
23/05/2024 Hydraulic system
OVERHAUL BEVEL GEAR OF 50 TONS CRANE OF VAT CACH PORT

- Removed and transferred completed bevel gear for luffing winch from Vat Cach port to MTB workshop - Fully overhaul gear system, renewed bearings and ect - Fully overhaul hydraulic...

View more
RENEW RUDDER BEARING CARRIER
22/05/2024 Diesel Engine
RENEW RUDDER BEARING CARRIER

Date: from 17th to 20th May 2024 Position: Singapore EPL Vessel: PVT SYNERGY

View more
SUPPLY OVERHAUL KIT AND OVERHAUL ME PNEUMATIC CONTROL SYSTEM OF ENGINE MAN B&W 6S50MC AT GO GIA - HO CHI MINH CITY - VIET NAM
SUPPLY OVERHAUL KIT AND OVERHAUL ME PNEUMATIC CONTROL SYSTEM OF ENGINE MAN B&W 6S50MC AT GO GIA - HO CHI MINH CITY - VIET NAM

SUPPLY OVERHAUL KIT AND OVERHAUL ME PNEUMATIC CONTROL SYSTEM OF ENGINE MAN B&W 6S50MC AT GO GIA - HO CHI MINH CITY - VIET NAM. CUNG CẤP BỘ KIT BẢO DƯỠNG VÀ BẢO DƯỠNG HỆ...

View more
BONDING PROPELLER SHAFT AFT SEAL OF MT LS VENUS AT VAN PHONG BAY - NHA TRANG - VIET NAM ON 15TH MAY 2024
BONDING PROPELLER SHAFT AFT SEAL OF MT LS VENUS AT VAN PHONG BAY - NHA TRANG - VIET NAM ON 15TH MAY 2024

Bonding propeller shaft seal at Afloat condition included stagging making. Ship repair at Van Phong bay in Nha Trang, Viet Nam. Total time: 1.5 days. MTB Engineering Service Co., Ltd

View more
LINE BORING FOR MAIN BEARINGS OF ENGINE AT X46 SHIP YARD
18/05/2024 Diesel Engine
LINE BORING FOR MAIN BEARINGS OF ENGINE AT X46 SHIP YARD

Name of project: : LINE BORING ENGINE Engine: 8NVD28 Place: X46 Shipyard Date: 04th -08th May 2024

View more
BONDING PROPELLER SHAFT AFT SEAL OF MT LS VENUS AT VAN PHONG BAY - NHA TRANG - VIET NAM ON 15TH MAY 2024
BONDING PROPELLER SHAFT AFT SEAL OF MT LS VENUS AT VAN PHONG BAY - NHA TRANG - VIET NAM ON 15TH MAY 2024

Bonding propeller shaft seal at Afloat condition included stagging making. Ship repair at Van Phong bay in Nha Trang, Viet Nam. Total time: 1.5 days. MTB Engineering Service Co., Ltd

View more
Main Engine Recondition of MV JIA YI 6
Main Engine Recondition of MV JIA YI 6

Project: Main Engine recondition Vessel: MV JIA YI 6 Type of VS: Bulk Carrier Customer: China’s shipowner Working place: Buoy No. 0 Working time: 12h Service type:...

View more
Overhauling AE Air Starter of MV Basel Athena
19/03/2024 Governor
Overhauling AE Air Starter of MV Basel Athena

Project: Overhauling AE Air Starter Vessel: MV Basel Athena Working place: Nosco Shipyard, Vietnam Service type: Normal Done by:  MTB engineer Team

View more
Overhauling Fuel Injection Pump of MV Tay Son 4
13/03/2024 Diesel Engine
Overhauling Fuel Injection Pump of MV Tay Son 4

Project: Fuel Injection Pump Vessel: MV Tay Son 4 Customer: Viet Nam Maritime Coporation Working place: Vietnam Completion time: 2 days (from 5th to 6th March 2024) Service...

View more
Oil Tanker Shaft bearing recondition
Oil Tanker Shaft bearing recondition

Project: Shaft bearing recondition Vessel: Kenzi 05 Type of VS: Oil Tanker Customer: coming from Syria Working place: Nosco Shipyard Completion time: 7 days Service type:...